Case Study
Cyanco Savings in Action:
ICMC Certification Compliance Assistance for South African Mine
Property
Customer Need
During the commissioning process, Cyanco was asked to assist with the design and start-up the mine’s cyanide dissolution system.
- The original dissolution system design had many flaws and threatened to delay the mine start-up.
- The site was not ICMC compliant.
Results
Cyanco designed a new system and our Applied Tech team remained on-site while the dissolution system was upgraded.
- Cyanco assisted with the training and start-up of dissolution system.
- Cyanco helped the site to successfully complete their ICMC pre-audit.